6th March 2016


Although we had the day off yesterday we did go shopping for kitchen wall tiles, we found some that were just the thing in B&Q for £10 a sq m beats Topps tiles cheapest they could do was £23 a sq m. I love a bargain.

Today it was back to work.

The plaster in the bedroom wasn't dry, mostly where it had been patched up and had to be rendered. We decided to get the radiators back on and get the boiler ticking over gently to give the plaster a little help to dry.

Alan fitted the radiators which meant replacing the brackets, topping up the radiator addative and bleeding them. We tried everything to get the boiler working, we knew it did work because it had been on when we first went in. After consultation with Colin on the phone when we got home, decided it was probablty the fan that was stuck and needed assistance, This will have to be done tomorrow night.

I finished painting the living room and set too sanding down the door frames.

Alan fitted the wall units and base units on one side of the kitchen.
Bedroom

Bedroom



Living room

Note the hole around the boiler chimney, we discovered the wet was getting in around the flashing outside and wet the ceiling so another couple of jobs to add to the list.