Having had Easter weekend off it was back to work.
We found the roof above the kitchen was still leaking, Alan set to work to find the problem and eventually found where it was coming from and fixed it. It appeared to be a gap between the tiles which has possibly been like it since the boiler chimney was fitted.
I tiled around the windows and window sills in the kitchen, also
repaired and painted one of the walls.
We sanded the door frames ready to paint so the doors can be fitted next week.
The bathroom lobby door will be on hold because we have'nt decided what to do about this yet because the door encroaches on the kitchen space and would be better placed at the other end but this would make a lot of mess and quite a cost to get it made right afterwards.