15th May 2016

Today I painted the bathroom door frame and then went out to paint the ceiling on the outside veranda, also the railings. Alan continued with the tank cupboard and shelving. I cleaned all the guttering and facias.


Before.....

.......After

14th May 2016


Today I painted the porch inside, and mowed the grass again, Alan started boarding in next to the tank cupboard ready for the shelves.

We had only half a day today because we brought mum over to see the place and had lunch in the bungalow.

8th May 2016

As it was lovely weather we continued outside, I painted the front fence panels and painted the bits of cream masonary on the front of the bungalow.

Alan worked on making good where the old bathroom lobby was, he also got all the moss off the roof and cleaned out the gutters.
 
Two down......


.........Three to go




7th May 2016

After having last weekend off it was back to work.

The skip was ordered and came very early so most of the rubbish went in, it was smaller than we thought and there are a few bits still left old plant pots etc but it looks a lot better.

The interior doors are now on and I painted these (photo to come). I also painted out the electric cupboard  and the door.

The carpenter had put on the tank cupboard door and boarded the side but it wasn't all he had promised and it wasn't a very good job either. Alan is going to have to do the rest of the boarding and sort the job out.

The tank cupboard