The skip was ordered and came very early so most of the rubbish went in, it was smaller than we thought and there are a few bits still left old plant pots etc but it looks a lot better.
The interior doors are now on and I painted these (photo to come). I also painted out the electric cupboard and the door.
The carpenter had put on the tank cupboard door and boarded the side but it wasn't all he had promised and it wasn't a very good job either. Alan is going to have to do the rest of the boarding and sort the job out.
![]() |
| The tank cupboard |
